Gebhardt Intralogistics Group

Germany

Machine and Plant Manufacturing

Gebhardt Intralogistics

Before

Where Production Scheduling Reached Its Limits

Manual planning and scheduling relying on Excel and experience

Limited capability to model production reality

No optimal sequencing or process synchronization

Long lead times and high inventory levels

Growing complexity: high vertical integration and expanding product portfolio

AFTER

What Changed

Fully automated production planning and scheduling with APS software

Realistic, transparent modeling of production

Realistic sequencing, synchronized processes

Reliable scheduling across capacity, materials, and skills

Shorter project lead times, lower inventory

Reliable schedules, even when conditions change

Three times the output compared with before implementation

David Schneider
Zitat
Through sequencing, our overall throughput has increased a lot. Ultimately, that means we get three times the output compared to before the implementation.

David Schneider, Supply Chain, Gebhardt Intralogistics

GEBHARDT INTRALOGISTICS GROUP

From Experience to Synchronized Production Planning and Scheduling

Gebhardt’s high level of vertical integration shapes its production environment. As its product portfolio expanded and the number of projects increased, planning and scheduling production became increasingly complex. Excel and experience no longer sufficed to reliably synchronize production, assembly, capacity, and material availability. Today, Gebhardt automates production planning and scheduling with Asprova. The APS system realistically models complex production processes and generates reliable sequences. The result: shorter lead times, lower inventory, greater planning and scheduling reliability, and around three times the output.

GEBHARDT INTRALOGISTICS GROUP

Gebhardt Intralogistics Group: System Solutions for Intralogistics

Based in Sinsheim, Germany, Gebhardt Intralogistics Group develops and produces system solutions for internal logistics. The company provides products, software, and services for warehousing, conveying and sorting technology as well as transport and assembly systems. Its solutions are used wherever material flows need to be automated. The portfolio ranges from storage technology, shuttle systems, warehouse robotics, and storage and retrieval machines to conveying, transport and sorting systems, goods lifts, automated guided vehicles, logistics software, and turnkey logistics centers.

One of Gebhardt’s key strengths is its ability to deliver end-to-end automation solutions from a single source—planned, manufactured, and implemented for complex intralogistics processes. A key factor behind this is the company’s high level of vertical integration. Many components are produced in-house and pass through numerous process steps: from laser cutting, punching, and bending to turning, milling, and welding, followed by pre-assembly, final assembly, and electrical installation. External process steps such as galvanizing and painting are also involved.

 

THE STARTING POINT

When Gebhardt’s Strength Became a Planning and Scheduling Challenge

Gebhardt’s high level of vertical integration is a major advantage for its customers; but it also adds complexity to production planning and scheduling. As the product portfolio grew and more projects and customer orders ran in parallel, keeping production and assembly synchronized became increasingly difficult. Components had to arrive in the right place at the right time across a growing number of interdependent processes.

Until 2016, Gebhardt largely relied on manual production planning and scheduling despite using SAP, with Excel and the production managers’ experience at the core of the process. They set start dates based on experience and reprioritized them at short notice whenever changes occurred. As long as complexity remained manageable, this approach worked. But as the company grew, it became a bottleneck: every additional project, variant, and dependency increased the effort required to review schedules manually, reprioritize them, and make ongoing adjustments.

The existing planning and scheduling approach could no longer reliably model the complexity of Gebhardt’s production environment. Components were not consistently synchronized across production, creating waiting times between process steps. Semi-finished goods remained in inventory longer and lead times increased. At the same time, it became increasingly difficult to provide reliable completion dates for individual customer orders.

For Gebhardt, this was about more than replacing one software tool with another. The priority was to capture the realities of production accurately and turn them into reliable schedules across all projects.

 

 

Case Study Gebhardt—Production Scheduling with Asprova APS

GEBHARDT x ASPROVA

The Decision to Implement Asprova APS

For Gebhardt, an APS solution was the obvious next step. The real question was not whether a system could plan and schedule in general, but whether it could reliably model the realities of the production environment.

The bar was high. Planning and scheduling had to account for limited capacity, primary and secondary resources, alternative resources, material availability, shift calendars, employee qualifications, and both internal and external production steps at the same time. Gebhardt-specific rules added another layer of complexity, such as which press brakes and assembly stations could be used, along with processing times, setup times, and lead times at external suppliers.

Gebhardt chose Asprova APS because it could accurately model the company’s processes, rules, and constraints. The project kicked off with a workshop in early 2016, followed by the SAP interface. By early July 2016, the system was live, with rescheduled production orders flowing back from Asprova into SAP.

Asprova was not introduced as a standalone planning and scheduling tool, but integrated into Gebhardt’s existing system landscape. Once a day, the APS system receives all relevant SAP data, including customer orders, planned and production orders, routings, bills of materials, material master data, inventory, purchase orders, and production progress. Using this data, Asprova creates a realistic production schedule across all relevant processes.

 

Tim Vierling
Zitat
Thanks to Asprova, we synchronized our processes, reduced inventory, and linked the assembly to the in-house parts manufacturing.

Tim Vierling, production planner, Gebhardt Intralogistics

ABOUT THE COLLABORATION

What Changed for Gebhardt Intralogistics

With Asprova, Gebhardt fundamentally changed how it plans and schedules production. What had been a largely manual, Excel-based process became automated, synchronized, and grounded in the realities of production. The real shift was not simply digitizing individual planning and scheduling steps, but creating a model that reflects the full complexity of production. Material availability, capacity, production sequences, assembly processes, employee qualifications, and both internal and external process steps now come together in a single schedule.

Asprova knows when materials will actually be available and when individual operations can start at the earliest. It flags missing materials, synchronizes semi-finished goods with downstream processes, and links subcomponents to assembly orders. This ties in-house manufactured parts to the customer orders they are needed for from the outset. So even if a part is initially treated as stock in the ERP system, Asprova already knows which customer order it belongs to.

External production steps such as galvanizing and painting are also part of the schedule. Asprova calculates pickup and return dates and lets Gebhardt test scenarios in which overloaded internal resources are relieved by outsourcing selected orders. When sequencing operations such as bending and turning, Asprova uses stored setup-time matrices to minimize changeovers and factor suitable alternative machines into the schedule.

In assembly, Asprova also supports Gebhardt with assembly groups and skills-based scheduling. Individual assembly orders can be grouped into efficient batches, while complex units are assigned to employees with the required qualifications. Schedule changes can also be assessed more reliably. Gebhardt can test whether a requested change is feasible and what impact it would have on other projects.

Production planning and scheduling at Gebhardt is now faster, more transparent, and more reliable. Processes are synchronized, inventory is lower, and project lead times are shorter.

Asprova updates more than 30,000 production orders every day across a 24-month planning horizon in around two minutes. More realistic sequencing has significantly accelerated project flow, with output now around three times higher than before Asprova.

 

Marco Gebhardt, Geschäftsführender Gesellschafter
Zitat
With Asprova APS, we increased inventory turnover by 50% and factory output by 100%.

Marco Gebhardt, managing partner, Gebhardt Intralogistics––12 months after implementing Asprova APS

WHAT THIS MEANS FOR YOUR PRODUCTION SYSTEM

What Gebhardt Reveals About the Limits of Conventional Production Planning and Scheduling

An ERP system alone cannot solve every production planning and scheduling challenge. At Gebhardt, too, key planning and scheduling steps still relied on Excel. Problems arise when production complexity outgrows the planning process.

That is when problems emerge that do not immediately look like planning and scheduling issues: long lead times, high levels of semi-finished inventory, unclear completion dates, frequent rescheduling, and heavy reliance on the experience of a few key people.

It is about capturing how production really works, with all its processes, resources, dependencies, and constraints, and using that model to create schedules that are both reliable and workable in practice.

 

YOUR INTRO CALL

How Much More Could Your Planning and Scheduling Deliver?

Are growing product variety, high vertical integration, long lead times, or heavy manual scheduling effort putting increasing pressure on your production planning and scheduling?

In an initial consultation, we look at how your production planning and scheduling works today and where there may be room to improve. Together, we explore whether an APS solution such as Asprova could support your team and where it could make a meaningful difference.

 

Asprova Consultant RF